• Skip to main content
  • Skip to primary sidebar

Downtown Austin Blog

downtown Austin's real estate and neighborhood blog

You are here: Home / Search for "21c"

Search Results for: 21c

Waller Creek Meeting Notes

Jude Galligan | December 4, 2009 |

Waller Creek District Master Plan - Land Use

At last night’s WCCAC meeting:

Downtown Austin’s Waller Creek District and tunnel project continues to get more interesting.  At last night’s meeting of the Waller Creek Citizens Advisory Committee we covered a lot of ground.

1) 21c developer, Poe Companies, updated us on the status of the project.  They’re actively pursuing stakeholder input, so I’m comfortable saying that this the only new residential project in downtown Austin that still has legs.  The site plan calls for three structures: 1) apartments 2) hotel 3) future site tbd.  The condos are out, for now, but could be built on the future site.  The current focus is a 31 story, 350 unit apartment tower at the southwest corner of Red River and Cesar Chavez.  The tower would provide 400,000 inhabitable square feet with target lease rates from $1.50-2.50 per foot.  Steve Poe anticipated a unit mix of 70% 1bd/1ba.  They are volunteering 10% of the units to meet affordable housing standards (80% MFI), although they are not required to provide any.  There will also be ~10 artist studios facing the creek.  It’s unknown how these units will be priced.  When asked about quality of construction, we were guided to look at AMLI on 2nd as a comparison.  This proposed downtown Austin apartment tower is fully entitled (needs no variances), and the only hurdle is locking in the funding, which they are seeking a substantial portion of through the HUD 211(s)(4) loan program for multi-family development.

The hotel concept would be located closer to the corner of Davis St and Red River.  It would have have 200-250 keys spread across 12 stories and 225,000 inhabitable feet.  In the near term, the hotel is less certain to be built than the apartment tower, as it is more challenging to find financing for a hotel – I find this ironic given that Austin has a shortage of hotels and [some would argue] a surplus of apartments.  Such is the state of the financial markets.

After several years of tunnel planning work, this is the first project to come before the WCCAC.  The development team seems to be very progressive and in tune with the Waller Creek District Master Plan.  They understand the importance of public space and improving public connections from Red River into Waller Creek trails.  The earliest the project could begin is mid-2010, and I’m optimistic they will obtain their funding.

One of the most important questions you’ll see asked of every project that comes before the WCCAC is the estimated contribution to the TIF.  The $120MM bond that pays for the tunnel improvements is paid back through the incremental increase in ad-valorem taxes along the creek.  21c estimated that it would generate $1MM per year ($20MM over twenty years), to repayment of the bond.

2) A summary of the Waller Creek District Draft Development Standards were presented by city staff.  This is a set of guidelines to reinforce the vision for Waller Creek as identified in the master plan.  Sub-districts are defined which spell out appropriate design for each sub-district.  These rules could be codified into law within the next 6-9 months.  It’s good that we’re establishing these guidelines now.  City council could potentially allow development to begin along the creek on a case-by-case basis by providing variances from building in the floodplain prior to completion of the tunnel.  Depending on the timing of adopting these development standards, the 21c project may/may not be subject to them.

3) The WCCAC has been trying to find a way to assure world-class design standards along the creek while working within the legal constraints of the city’s procurement processes. Currently, the city will hire a firm capable of delivering a product.  THEN they seek input to design the product.  The city hires the firm before knowing what the final design looks like.  This process precludes “design competitions”, but the WCCAC has a much better understanding of how and to deliver aesthetic design input.  With enough lead time, a private sector “design competition” could occur such that the winner’s concept is delivered to the firm hired by the City, via the WCCAC.

-Jude

21c Museum/hotel
Waller Creek District

Filed Under: downtown austin, waller creek

Waller Creek Meeting Notes

Jude Galligan | November 13, 2009 |

waller-creek-tunnel-city-acquires-land

At last night’s WCCAC meeting:

1) We learned that the City is negotiating the purchase of three contiguous lots located along southbound frontage road and bounded by 4th and 5th Streets.  This area hosts the east bank of Waller Creek between 4th and 5th and is currently used as a surface parking lot.  The land acquisition will be purchased with funds from the Waller Creek Tunnel Project, and will likely become a temporary staging ground for the construction of the tunnel.  Ironically [to me at least] these lots are not on FEMA’s 100 year flood maps, and therefore wouldn’t directly benefit from the tunnel improvements designed to remove land from the 100 year flood plain. The lots are encumbered by Capitol View Corridors, though.  You can see the lots under “Kuykendall Addn”.

2) The WCCAC made an official recommendation to City Council that the Strategy 1 improvements identified by ROMA’s Waller Creek District Master Plan be included in the items for the 2010 Transportation Bond.  The bond is limited to issues of mobility, including pedestrian uses such as the conversion of Sabine Street into a promenade.

3) Perry Lorenz provided citizen communication that the 21c project is moving forward and the development team is flying to Austin from Louisville with updates in the first week of December.  In addition to getting a more comprehensive project status, we should receive a better idea of the amount and types of consideration the project is paying towards Waller Creek improvements adjacent to the property.

4) The I-35 Makeover project is going to be complete in 2010 and will be funded from the parking fees collected underneath I-35.  No word yet on improvements to the 4th Street overpass, but WCCAC requested to be included as a stakeholder should that discussion commence.

5) Matt Knifton of the Texas Rowing Center provided citizen communication about TRC’s bid for the boathouse.  Notably, last year TRC donated roughly $30,000 in community outreach in the form of education and classes for minority children and those with disabilities.  Matt estimated that as a PARD concessionaire since 1999, the TRC has returned over $400,000 to the city;moreover, throughout a 20 year lease of the new boathouse, there is potential to generate nearly $3MM in concession revenue for the city.  The TRC would have the opportunity to further increase their community outreach programs, making the lake more accessible to more Austinites.

In summary, it’s nice to see action and momentum!

-Jude

Filed Under: downtown austin, urban planning, waller creek

Hotel Planned At 3rd & San Jacinto

Jude Galligan | October 12, 2009 |

Poe Companies and White Lodging appear to be working towards a hotel deal in downtown Austin.  The project, as currently envisioned, would be a Hyatt hotel with ~275 hotel rooms.  DANA was approached for preliminary feedback by Armbrust and Brown, in preparation for consideration by City Council for increasing the entitled FAR from 8:1 to 12:1.  No site plan, architectural drawings, or financing is confirmed.

The property is currently a surface level parking lot.  Poe Companies is planning the 21c museum/hotel/condo concept at Cesar Chavez and Red River – which had been planned at 3rd and San Jacinto.  Poe Companies controls the lot being considered for the Hyatt hotel, and the 1/2 block located across the street, known as the Whitely Paper building.

Google street view showing current state of the property (please wait for it to load)

-Jude

Filed Under: austin news, downtown austin

Hyatt Place In Downtown Austin?

Jude Galligan | August 17, 2009 |

Massing Sketchup Of Hyatt Place
Sketchup Of Possible Massing Of Hyatt Place

Following this thread over at SkyscraperPage, some readers found evidence of a forthcoming hotel on the southwest corner of 3rd and San Jacinto.  Currently the parking lot is owned by the folks who had planned to build 21c – which has moved to Red River @ Cesar Chavez – at the Whitely Paper company building.  Stay tuned!

Filed Under: downtown austin Tagged With: austin hotels, hyatt place

1/2 City Block For Sale

Jude Galligan | May 15, 2009 |

The ABJ is reporting that the Whitely Paper Co. building, which was the original site for the downtown Austin 21c Museum & hotel, is back on the market for $3.8MM.

Map

Filed Under: development

  • « Go to Previous Page
  • Go to page 1
  • Go to page 2
  • Go to page 3
  • Go to Next Page »

Primary Sidebar

Archives

TOWERS.net – Austin Condos For Sale

TOWERS realty
LEGAL NOTICE: Texas Real Estate Commission Consumer Protection Notice. • Information About Brokerage Services. • Copyright © 2007-2022 Jude Galligan. All rights reserved. Site Map